Home ProductsFire Fighting Valves

Regorge Preventer Fire Fighting Valves 300PSI Prevent Medium To Flow Backwards

China Winan Industrial Limited certification
China Winan Industrial Limited certification
WINAN's products are very good, the materials and craftsmanship of the products are very good, we hope to reach cooperation with WINAN to create a better future

—— Amanda

Our company has been cooperating with WINAN for nearly 3 years, and the overall effect of the products has been very good. I don’t think we will change other factories to produce fire protection products.

—— BILL-purchase

I'm Online Chat Now

Regorge Preventer Fire Fighting Valves 300PSI Prevent Medium To Flow Backwards

Regorge Preventer Fire Fighting Valves 300PSI Prevent Medium To Flow Backwards
Regorge Preventer Fire Fighting Valves 300PSI Prevent Medium To Flow Backwards Regorge Preventer Fire Fighting Valves 300PSI Prevent Medium To Flow Backwards

Large Image :  Regorge Preventer Fire Fighting Valves 300PSI Prevent Medium To Flow Backwards

Product Details:
Place of Origin: Guangdong, China
Brand Name: WINAN
Certification: CCC ISO
Model Number: LHS743X
Payment & Shipping Terms:
Minimum Order Quantity: 10
Price: Negotiate
Packaging Details: Carton, Pallet, Wooden case or as required
Delivery Time: Shipped in 15 days after payment
Payment Terms: L/C, T/T, Western Union
Supply Ability: 3000 Set/Sets per Month
Detailed Product Description
Nominal Diameter: DN40-DN200 Working Pressure: 300PSI
Nominal Pressure: 1.0MPa Or 1.6MPa Connection: Flange
Material: Cast Iron, Ductile Iron, Stainless Steel, Carbon Steel Color: Blue, Red, Purple Or Customer Requied
High Light:

fire fighting gate valve

,

fire check valve

Regorge Preventer Flange Connection Prevent The Medium to Flow Backwards

 

Introduction:

 

Regorge Preventer is one kind strictly defined in the pipeline the water only can unifiow the water power cxxitrol aggregate unit, its function is in any situation prevented in the pipeline the medium flows backwards, achieved avoids flowing backwards the pollution goal.

This vavle is suitable on system such as petroleum, chemical industry, foodstuff, medicine, papemaking, water and electricity, shipping, plumbing, the smelting and sources of energy etc the pipe route. Can regard on gas, liquid, semifluid as well as solid powder pipes and power lines and the container of many kinds of corrosiveness and non-corrosiveness adjusts and dams a river the equipment use. Especially extensively being in high layer of building fire protection system reaches other to show in the pipes and power lines system of valve of vavle switch state.

 

 

Parameter:

 

Regorge Preventer Fire Fighting Valves 300PSI Prevent Medium To Flow Backwards 0

Main dimensions and weight

DN(mm)  Valve long Valve high  Weight(kg)
40 415 272 35
50 415 272 35
65 440 340 40
80 485 365 55
100 530 385 60
150 600 430 87
200 625 510 175
 
 

Main Material:

Product Name
Regorge Preventer
Material
Cast Iron, Ductile Iron, Stainless Steel, Carbon Steel
Color
Blue, red, purple or customer require
Standard
API609, AWWA C504, DIN3354 F4, GB/T12238, JIS 10K, BS5155
Connection
Flange
Media
water, gas, oil etc.
Size
1 1/2''-- 8''
Certificate
ISO9001-2008

 

 

Working Principle:

 

Regorge Preventer the principle of work is has flcjwed enters when the water check valve because the mechanical resistance using the medium and has flowed the loss of head but the reduced pressure, causes the inlet pressure to be higher than the draw-off valve cavity the pressure, but on the draw-ofF valve diaphragm pressure is the inlet pressure, on the diaphragm the pressure is bigger than the draw-off valve cavity and the spring resistance, the draw-off valve maintenance closure, the medium normally flows, when the inlet pressure and the draw-off valve cavity pressure difference is smaller than 0.02MPa, the medium is at the critical state which flows backwards, by now on the draw-off valve diaphragm the pressure was smaller than the draw-off valve cavity and the spring pressure, the drawoff valve automatically opens, will ftaw backwards outside the medium eduction tube, simultaneously the massive air admission valve cavity, formed the air room partition, ceased the medium to flow backwards, Is bigger than when 0.02MPa draw-off valve automatic shut-off.

After the valve the pipe network hydraulic pressure elevates when surpasses the valve advance water end hydraulic pressure, if second unidirectional make a round trip;goes to the valve seal to be complete, the water body cannot flow backwards, this time draw-off valve closure not drainage, when the second Jianxi check valve seal malfunctions when has the leakage,frie draw-off valve opens the drain- ing water decompression.

 

Installment explained:

1. Before installment, dean all pipelines.

2. Flows backwards the stopper according to the valve body arrow to the level installment installs the position to be supposed to facilitate the debugging and the service.

3. Regorge preventer beginnings and ends to be supposed to install the service gate valve, before the import installs the filter, moreover shcxild have an end to be loaded with the attachment

4. The draw-off valve should not be smaller than 300mm from the ground, draw- off valve below should remain has the draining water ditch. After

5. After the installment finished, the primary start use, should dose exports the gate valve, slowly opens imports the gate valve, lets the medium slowly fill flows backwards the stopper, turns on each test ball valve to remove the valve air, after treats the valve cavity uniftow. slowly turns on the gate valve, lets the water fill the pipeline.

6. When import medium pressure variation, the draw-off valve appears the few water leakages to be the normal

 

Installs the position:

 

1. Turns on the user by the municipal administration pipe network to direct the water pipe between the water meter and on the valve pipeline.

2. On fire pump adapter on lead-in tube or fire outlet pipe.

3. In the water supply system has the chemical to pour into gives on the water pipe.

4. On the heater cold water water inlet pipe, and so on possibly produces on the water supply pipeline which flows badcwards.

 

 

FAQ:

 

Q1. What is your payment term?
A: T/T 30% down payment, balance to be paid before shipment. or L/C.

Q2: What is your main market?
A: Western Europe, North America, Janpan,,

Q3: Can I get samples from your factory?
A: Yes, sample is free, but the express charge is yours.

Q4: If products have some quality problem, how would you deal with?
A: We will responsible for all the quality problems.

Q5.Are you manufacturer or trading company?
A.We are manufacture(cast iron) and trade company.

Q6. what’s the payment term?
A. We accept T/T, L/C,WESTERN UNION

Q7. What’s the delivery time ?
Pattern needs 30-60 days, sample need 30-50 days.
The first order need 60 days

Q8. What is the standard of package?
A. Export standard package or special package according to customer requirement.

Q9. Do you accept OEM business?
A. Yes, we are OEM supplier.

Q10. what kind of certificate you have ?
A .We have ISO9001, ISO14001,PED,SGS

 

 

 

Contact Details
Winan Industrial Limited

Contact Person: Sales Manager

Send your inquiry directly to us (0 / 3000)